During Phase I of the Coolbrook Restoration Project, KBS Construction mobilizes heavy equipment and skilled crews to build the planned stream restoration features. The active construction process includes regarding the stream channel to a stable, natural shape, installing grade control structures to direct flow and reduce erosion, stabilizing streambanks with rock, soil, or natural materials, and planting native vegetation along the riparian zone to strengthen banks, provide habitat, and support long-term ecological recovery.